+61 7 3371 6122
admin@qhmbirt.com.au
PO Box 235, Toowong QLD 4066
20180805_163509.jpg

Description

Raise of existing tailings storage facility including:

  • 450,000m3 of zoned engineered embankment
  • Construction of concrete and rockfilled batter chutes
  • Demolition of existing spillway and construction of new concrete spillway
  • Raise of existing Decant structure
  • Removal of existing tailings pipeline and installation of new tailing and seepage return pipeline system
  • Installation and commisioning of Vibrating Wire Piezometers and data logging system
  • Rehabilitation and seeding

Leave a Reply

Review

*