+61 7 3371 6122
admin@qhmbirt.com.au
PO Box 235, Toowong QLD 4066
Stay connected:
Gove-Pond-4-Capping-Project.jpg

Description

Rehabilitation and decommissioning of tailings storage facility including:

  • 400,000 m3 of reshaping earthworks to design levels
  • 1M m3 of layered earthworks construction over HDPE liner
  • Detailed excavation of perimeter catchment drains and outlet chute
  • Installation of large scale precast concrete culverts and;
  • Installation of topsoil, gravel and concrete filled geoweb systems